Case Studies ::
Faculty of Education

| Client | University of Cambridge |
| Location | Cambridge. |
| Architect | BDP |
| Contractor | AMEC |
| Project Value | £400K |
| Year Completed | 2005 |
| Specification |
GALVANISED PURLINS, BRACKETS AND CLEADER RAILS. VAPOUR CONTROL LAYER. 150mm ROCKWOOL INSULATION. BREATHER MEMBRANE. TIMBER JOISTS, COUNTERBATTENS AND CLOSE BOARDING. FULLY WELDED ALUMINIUM GUTTERS. 0.7mm PRE-WEATHERED RHEINZINK. FULLY DESIGNED MAN-SAFE ACCESS SYSTEM. |
|
|
![]() |
|


