Maintenance and Refurbishment - High Security compound

The re-roofing of the buildings required the existing roof to be stripped and disposed of into waste bags and the removal of the redundant asphalt breather vents to be undertaken before the surface could be cleared ready to receive the new finishes.

Once the team had prepped the buildings for the new roof, they raised the existing roof vents to ensure they had the minimum upstand clearance to meet the new system requirements. The team then installed the new Trocal primer and VCL system, 100mm Trocal InnoBond insulation and light grey Trocal SGK single ply membrane.